HALF WAY!
Thats right, we are now on day 34 of our 65 Day Schedule... Just another few weeks until we can start our work.
So they finished up all the re-bar, and most of the forms...
They didn't pour concrete as scheduled on Friday, but should be pouring first thing next week.
Oh, and my electrical inspection went off without a hitch!.
Saturday, August 28, 2010
Tuesday, August 24, 2010
Day 31
Monday, August 23, 2010
Day 30
Today they continued with re-bar and started to build forms for the concrete.
I installed the grounding wire for the electrical, and need to figure out how that gets inspected before they pour concrete on Friday.
Also, we encountered out first problem today. There is an issue with how the drain pipe for the new toilet needs to pass through a grade beam. Hopefully a quick conversation with the structural engineer will resolve our problem.
Grounding Wire
I installed the grounding wire for the electrical, and need to figure out how that gets inspected before they pour concrete on Friday.
Also, we encountered out first problem today. There is an issue with how the drain pipe for the new toilet needs to pass through a grade beam. Hopefully a quick conversation with the structural engineer will resolve our problem.