Monday, August 23, 2010

Day 30

Today they continued with re-bar and started to build forms for the concrete.
I installed the grounding wire for the electrical, and need to figure out how that gets inspected before they pour concrete on Friday.
Also, we encountered out first problem today. There is an issue with how the drain pipe for the new toilet needs to pass through a grade beam. Hopefully a quick conversation with the structural engineer will resolve our problem.