Wednesday, February 2, 2011

Currently

I know, I know… It’s been a month since my last post.
Well the lack of posting means progress with working.
It has been nonstop insanity since Bay Concrete wrapped up.
As of right now the electrical is about 95% roughed in, the plumbing should be all but wrapped up by the end of this weekend, and we still have all the ductwork to do.

So… here are some pictures to catch you up from the last time I posted.

Photobucket

Photobucket

Photobucket

We pulled up the old flooring in the bathroom because it was in such bad shape
Photobucket

Photobucket

Photobucket

Photobucket

We dropped the ceiling for the new living room about ½” to make it perfectly level
Photobucket

Built the rest of the wall that will hold the TV
Photobucket

Photobucket

Photobucket

Kitchen lighting
Photobucket

Photobucket

Photobucket

Photobucket

Photobucket

Electrical Panel
Photobucket

Photobucket

New shutoff valves for plumbing
Photobucket

Garage Door was installed
Photobucket

Photobucket

Ramps were built
Photobucket

General Mess
Photobucket