First up, our sound isolation system.
Using rubber isolators, metal hat channel, two layer of sheet rock, and a product called green glue, we hope to acoustically separate the two units.





The reason for the strips of Sheetrock on the track is because I messed up the depth of our light boxes... they were sitting between 1/8" and 1/2" two low... so I had to shim the entire ceiling to make sure the lights came our correctly.



Here a few more pictures of the rest of the house.





Sheet Rocked stacked and ready to go.


Once our isolation system was in place, it was time to Sheetrock.
We hired a team of guys to come in and knock this out. If I had to guess, it would have taken Evan, Alec and myself at least 6 weeks to hang the rock, tape and mud it.
After two days, the Sheetrockers completed about 90% of the house. We will have a screw inspection tomorrow and they will most likely be done tomorrow or Wednesday.